What this calculator is for
Quoting and sanity-checking laser cutting jobs: a sign, a batch of keyrings, a perforated panel. It answers the two questions every job raises — how long will the machine run, and what does the job cost — from the path length, the pierce count and the rates you supply, so the numbers are your shop's numbers and nobody else's.
Formula and assumptions
Every rate in the formula is a user input, filled in for your own machine and your own shop. The feed rate is the speed you actually run for that material and thickness; the machine rate is the hourly figure you need an hour on your machine to earn or recover; the material cost is what your blank costs. The pre-filled numbers are an editable example only — this page carries no built-in rate card, because copying another shop's rates produces another shop's prices.
The arithmetic is deliberately plain about what it leaves out: travel moves between shapes, acceleration out of corners and any engraving passes are not in the path figure, so a real job runs somewhat longer than the estimate. Treat the result as the honest floor for a quote, and fold your own margin into the setup minutes if you want it inside the number.
Reading your result
The big figure is the whole job cost; the bars split it into machine time and material so you can see which side dominates. On small jobs the setup minutes usually outweigh the cutting — that is the signal to batch several pieces into one run. On perforated work the pierce line is the one to watch: pierce minutes grow with shape count, not path length, so simplifying a design's hole count can beat raising the feed rate. Cost per inch gives you a comparison figure across jobs of different sizes.
Worked example
The pre-filled sign job — 240 in of cut at 120 in/min, 12 pierces at 1.5 s, 5 minutes of setup, a $60/hr machine rate entered as a user figure and $12 of material: cutting takes 2 minutes, pierces add 0.3 minutes, and the total is 7.3 minutes, which at that rate is $7.30 of machine time — a $19.30 job with material. Scale up to a 900 in panel with 40 pierces and $30 of material and the same arithmetic gives 13.5 minutes and $43.50. Both are computed by the same tested function the calculator above runs.
Common mistakes
Forgetting the inner shapes. Cut length is every path — outlines, holes, lettering counters — not just the outside perimeter; a word sign can have more length inside its letters than around them. Ignoring pierces on hole-heavy work. Two hundred pierces at 1.5 s is five minutes of standing still, invisible in the path length. Borrowing a feed rate from a chart for a different thickness. Feed rate belongs to your material at your thickness on your machine; a borrowed rate quietly falsifies both the time and the price. Quoting the estimate as the promise. The figure excludes travel and cornering losses by design — quote it with a margin, not as a guarantee.
Quick reference: job size to time & cost
At 120 in/min feed, 1.5 s pierces, 5 minutes of setup and a $60/hr machine rate entered as an example user figure, computed by the same function as the calculator:
| Job | Cut length | Pierces | Material | Total time | Job cost |
|---|---|---|---|---|---|
| Keyring batch | 60 in | 10 | $3.00 | 5.8 min | $8.75 |
| Small sign | 240 in | 12 | $12.00 | 7.3 min | $19.30 |
| Wall panel | 900 in | 40 | $30.00 | 13.5 min | $43.50 |
| Perforated sheet | 1500 in | 200 | $45.00 | 22.5 min | $67.50 |
Your feed rate and machine rate will differ — enter them above for your own figures.
Common questions
Where do I get the total cut length?
From your design or laser software: most vector editors and laser control programs report the total path length of a job, counting every outline and every inner shape once. If yours does not, estimate by adding up the shapes — perimeters for outlines, circumferences for circles. Engraving (raster or fill) time is not part of this figure; this calculator prices vector cutting only.
What machine rate should I enter?
Your own — that is the point of the field. If you run a service, it is the hourly rate your shop charges or needs to recover: machine payments, consumables, your labour and overhead divided into billable hours. If you cut for yourself, it is whatever an hour of machine time is worth in your costing. This page deliberately builds in no rate of its own, because a rate copied from someone else's shop produces someone else's prices.
Why count pierces separately from cut length?
Because a pierce is not cutting: the head stops, punches through the material, and only then starts moving. On a job with many small holes or separate shapes, pierce time rivals cut time — forty pierces at a second and a half each is a full minute of the head standing still. Jobs with few, long shapes barely notice pierces; perforated and multi-part jobs live or die by them.
Does the estimate include travel moves and corner slowdowns?
No — and it says so rather than padding silently. The arithmetic is path length ÷ feed rate, plus pierces and your setup figure. Real heads also accelerate out of corners and travel between shapes with the laser off, so real jobs run somewhat longer. Use the result as the honest floor and add your own margin when you quote; the setup field is a practical place to fold in the fudge factor you know your machine needs.