Home · Finance · Business & Accounting · Earned Value Management Calculator

Earned Value Management Calculator

Read a project's cost and schedule health from planned value, earned value and actual cost, with the forecast cost at completion.

Your figures

Example result — edit the figures to make it yours

0.82

Cost performance index (CPI)

Computed from the inputs on this page with the formula below — change any figure and every result updates.

Schedule performance index (SPI)0.90
Cost variance (CV)-20,000.00
Schedule variance (SV)-10,000.00
Estimate at completion (EAC)244,444.44
Percent complete45.00 %

What this calculator does

Read a project's cost and schedule health from planned value, earned value and actual cost, with the forecast cost at completion. Every figure on this page is your own input — no lender's rate, no country's tax table and no market forecast is built in — and every result is computed from the formula stated below, with no hidden rounding steps. Results are estimates for planning, not financial advice.

The formula and method

CPI = EV ÷ AC; SPI = EV ÷ PV; CV = EV − AC; SV = EV − PV; EAC = BAC ÷ CPI

Earned value management compares three quantities at the status date: planned value (PV, work scheduled), earned value (EV, work accomplished, valued at budget) and actual cost (AC). The cost performance index CPI = EV/AC is the headline: above 1 means the work cost less than budgeted, below 1 means overruns.

The schedule performance index SPI = EV/PV works the same way for progress. The estimate at completion EAC = BAC/CPI projects the final cost if the current cost efficiency persists — one of several EAC conventions, and the one used here. Percent complete is EV divided by the budget at completion (BAC).

Worked example

With the example inputs this page opens with (planned value (pv) 100000, earned value (ev) 90000, actual cost (ac) 110000, budget at completion (bac) 200000), the result is 0.82 — cost performance index (cpi). Computed from the inputs on this page with the formula below — change any figure and every result updates.

Quick reference

Quick reference — varying planned value (pv)
Planned value (PV)Cost performance index (CPI)
500000.82
800000.82
1000000.82
1250000.82
1500000.82
2000000.82

Computed with the same formulas as the calculator above — enter any values there for figures beyond this table.

Common questions

How does the Earned Value Management Calculator work?

Read a project's cost and schedule health from planned value, earned value and actual cost, with the forecast cost at completion. Planned value · Earned value · Actual cost · Budget at completion → Cost performance index. The result updates as you type, and the formula and method on this page state the exact definitions used, so you can reproduce the calculation by hand.

What inputs does the Earned Value Management Calculator need?

Planned value · Earned value · Actual cost · Budget at completion → Cost performance index. Invalid entries — such as a zero denominator, an out-of-range value or a malformed list — produce a plain-language message instead of a misleading number.

Is the Earned Value Management Calculator free to use?

Yes. It runs entirely in your browser with no sign-up, and the same calculator is available as an embeddable widget via the Embed button, so it can be placed on another site with its calculation intact.