Home · Construction & Home DIY · Stone Calculator

Stone Calculator

General stone — crushed, decorative or fill stone by volume and weight. Estimates the weight in short tons, plus the cubic yards and cubic feet, for a rectangular area at a chosen depth.

Your figures

Example result — edit the figures to make it yours

2.59

Material needed

Volume1.85 yd³
Volume50.00 ft³

What this calculator does

General stone — crushed, decorative or fill stone by volume and weight. Estimates the weight in short tons, plus the cubic yards and cubic feet, for a rectangular area at a chosen depth. Every figure is computed from the formula stated below. Densities, waste percentages and coverage rates appear as editable inputs with their planning defaults stated in the method notes — they are assumptions you can adjust to your supplier and your site, not industry standards.

The formula and method

Volume (yd³) = L × W × (D/12) / 27; Tons = Volume × density

The bed is treated as a rectangular prism: length × width × depth, with the depth entered in inches and converted to feet.

The density default of 1.4 short tons per cubic yard is a planning assumption only — bulk densities vary with stone size, moisture and compaction, so confirm the figure with your supplier before ordering.

No waste or compaction allowance is built in; increase the depth or add a margin for uneven ground and settling.

Worked example

With the example inputs this page opens with (length (ft) 20, width (ft) 10, depth (in) 3, density (short tons/yd³) 1.4), the result is 2.59 — material needed. Change any figure and the result updates with the same formula.

Quick reference

Quick reference — varying Depth (in)
Depth (in)Material neededVolumeVolume
21.7283951.23456833.333333
32.5925931.85185250
43.456792.46913666.666667
65.1851853.703704100
86.913584.938272133.333333
1210.370377.407407200

Computed with the same formulas as the calculator above — enter any values there for figures beyond this table.

Common questions

How much stone does one cubic yard weigh?

This calculator uses 1.4 short tons per cubic yard as an editable planning default. Actual weight varies with gradation and moisture, so check the supplier's figure for your material and adjust the density field.

Should I order extra material?

Yes, a small margin is prudent: uneven subgrade, spillage and compaction all consume material. Many buyers add roughly 5–10% — treat that as a planning choice, not a fixed rule, and adjust for your site.

How does the Stone Calculator work?

General stone — crushed, decorative or fill stone by volume and weight. Estimates the weight in short tons, plus the cubic yards and cubic feet, for a rectangular area at a chosen depth. Length (ft) · Width (ft) · Depth (in) · Density (tons/yd³) → Material needed (short tons). The result updates as you type, and the formula and method on this page state every assumption used, so you can reproduce the calculation by hand.

What inputs does the Stone Calculator need?

Length (ft) · Width (ft) · Depth (in) · Density (tons/yd³) → Material needed (short tons). Densities, waste percentages and coverage rates are editable — adjust them to your supplier's figures. Invalid entries produce a plain-language message instead of a misleading number.