Home · Construction & Home DIY · Concrete Estimator - Tube

Concrete Estimator - Tube

The concrete needed to fill cardboard tube forms (such as Sonotube) for footings and piers, in cubic yards and 80 lb premix bags.

Your figures

Example result — edit the figures to make it yours

0.12

Concrete needed

Premix bags (80 lb)6 bags
Concrete volume3.14 ft³

What this calculator does

The concrete needed to fill cardboard tube forms (such as Sonotube) for footings and piers, in cubic yards and 80 lb premix bags. Every figure is computed from the formula stated below. Densities, waste percentages and coverage rates appear as editable inputs with their planning defaults stated in the method notes — they are assumptions you can adjust to your supplier and your site, not industry standards.

The formula and method

Volume = π × (d/24)² × height × count / 27

A filled tube is a cylinder: cross-section π·r² with the radius converted from inches to feet, times the filled height.

Use the filled height, not the full tube length, if the tube extends above the pour.

Bag counts use the site-standard premix yield of 0.60 ft³ per 80 lb bag, rounded up to whole bags.

Worked example

With the example inputs this page opens with (tube diameter (in) 12, filled height (ft) 4, number of tubes 1), the result is 0.12 — concrete needed. Change any figure and the result updates with the same formula.

Quick reference

Quick reference — varying Tube diameter (in)
Tube diameter (in)Concrete neededPremix bags (80 lb)Concrete volume
80.05171331.396263
100.08080242.181662
120.11635563.141593
160.206854105.585054
180.261799127.068583
240.4654212112.566371

Computed with the same formulas as the calculator above — enter any values there for figures beyond this table.

Common questions

What diameter should I enter for a nominal tube?

Enter the tube's actual inside diameter. Nominal tube sizes can differ slightly from the true inside measurement, and because volume goes as the diameter squared, a small error matters — measure the tube if you can.

Should the tube extend below frost depth?

Footing depth is set by your local code and frost line, which this calculator does not determine. Set the filled height to the depth your design requires.

How does the Concrete Estimator - Tube work?

The concrete needed to fill cardboard tube forms (such as Sonotube) for footings and piers, in cubic yards and 80 lb premix bags. Tube diameter (in) · Tube height (ft) · Number of tubes → Concrete needed (yd³). The result updates as you type, and the formula and method on this page state every assumption used, so you can reproduce the calculation by hand.

What inputs does the Concrete Estimator - Tube need?

Tube diameter (in) · Tube height (ft) · Number of tubes → Concrete needed (yd³). Densities, waste percentages and coverage rates are editable — adjust them to your supplier's figures. Invalid entries produce a plain-language message instead of a misleading number.