What this calculator is for
Small solid poured-concrete stairs — porch steps, garden steps, deck access steps — where the whole stepped profile is concrete down to the ground. It answers the ordering question: how many cubic yards (or cubic metres) the stepped flight itself takes. Landings, footings and hollow waist-slab stairs are different shapes and are handled separately, as the notes below make plain.
Formula and assumptions
The governing assumption is stated up front: the stair is solid. Step i is i risers tall, so the side profile is a staircase wedge whose area is the tread run times the triangular sum of riser heights; multiplying by the width gives the volume. The riser count is your input — this page divides your total rise evenly by it and reports the resulting riser height, but it makes no claim about what riser height or tread depth any rule requires. No landing, footing, base slab, waste or over-break allowance is included in the figure.
Reading your result
The big figure is the concrete volume for the flight alone, in cubic yards with the cubic-foot figure alongside. The riser height shown is your total rise split evenly across your riser count — check it is the step height you actually intend to form. Total run is the ground length the flight occupies: riser count × tread run. If your pour includes a landing or a base thickening, add those slab volumes to this figure before ordering.
Worked example
A stair 3 ft wide with a 30 in total rise, a 10 in tread run and 4 risers: each riser is 30 ÷ 4 = 7.5 in. The profile sum is 1 + 2 + 3 + 4 = 10, so the volume is 36 in × 10 in × 7.5 in × 10 = 27,000 in³ = 15.625 ft³, which is 0.579 yd³. These figures are computed by the same tested function the calculator above runs — change the inputs and they move together.
Common mistakes
Calculating the stair as a simple box (total rise × total run × width), which roughly doubles the true solid volume — the profile is a wedge, not a rectangle. Forgetting the landing at the top, or counting it twice by extending the rise into it. Using a riser count without checking the resulting riser height — the even split is shown in the result for exactly this check. Ordering the exact volume with no allowance for spillage and uneven ground under the pour.
Quick reference: common solid stairs
Solid-profile volumes for common porch and deck stairs, computed by the same function as the calculator:
| Stair | Width | Total rise | Risers | Riser height | Concrete |
|---|---|---|---|---|---|
| Low step | 3 ft | 22.5 in | 3 | 7.50 in | 0.347 yd³ |
| Porch stair | 3 ft | 30 in | 4 | 7.50 in | 0.579 yd³ |
| Wide porch stair | 4 ft | 37.5 in | 5 | 7.50 in | 1.157 yd³ |
| Deck stair | 4 ft | 45 in | 6 | 7.50 in | 1.620 yd³ |
| Tall stair | 4 ft | 60 in | 8 | 7.50 in | 3.056 yd³ |
Solid flight only — landings, footings and waste are not included.
Common questions
Why does the volume use 1 + 2 + 3 + … in it?
Because a solid stair is a staircase-shaped wedge, not a box. The first step is one riser tall, the second step sits on two risers of height, and the last on all of them — so the side profile's area is one tread run times the sum 1 + 2 + … + riser count, in riser-height units. Multiply by the width and you have the solid volume the formwork holds.
Does this include a landing, footing or base slab?
No. The figure is the stepped flight only, poured solid to the ground. A landing is a separate slab volume (length × width × thickness), and any footing or thickened base under the stair is separate again — calculate each with a slab volume and add them together before ordering.
My stair is hollow underneath — is this still right?
It will overstate the concrete, deliberately: this calculator models the solid profile, which is how small porch and garden stairs are usually poured. A hollow or waist-slab stair (a sloped slab with steps formed on top) uses less concrete and needs its own breakdown — slab volume plus the triangular step volume — rather than this solid figure.
How much extra should I order?
This page adds nothing: the result is the exact geometric volume. Spillage, formwork bulge, uneven ground under the stair and pump or barrow losses are real, so add your own allowance on top — your supplier or contractor will suggest a figure for your pour conditions. Ordering the exact number with no margin is the classic way to run short on the last step.