Home · Construction & Home DIY · Concrete Footing Calculator

Concrete Footing Calculator

The concrete volume for a continuous strip footing, in cubic yards and in 80 lb premix bags, from its length, width and depth.

Your figures

Example result — edit the figures to make it yours

1.32

Concrete needed

Premix bags (80 lb)60 bags
Concrete volume35.56 ft³

What this calculator does

The concrete volume for a continuous strip footing, in cubic yards and in 80 lb premix bags, from its length, width and depth. Every figure is computed from the formula stated below. Densities, waste percentages and coverage rates appear as editable inputs with their planning defaults stated in the method notes — they are assumptions you can adjust to your supplier and your site, not industry standards.

The formula and method

Volume (yd³) = Length × (Width/12) × (Depth/12) / 27

The footing is treated as a rectangular strip: length times width times depth, with width and depth entered in inches.

For stepped or pad footings, run each rectangular section separately and add the volumes.

Bag counts use the site-standard premix yield of 0.60 ft³ per 80 lb bag, rounded up; no waste allowance is built in.

Worked example

With the example inputs this page opens with (footing length (ft) 40, width (in) 16, depth (in) 8), the result is 1.32 — concrete needed. Change any figure and the result updates with the same formula.

Quick reference

Quick reference — varying Footing length (ft)
Footing length (ft)Concrete neededPremix bags (80 lb)Concrete volume
100.329218158.888889
200.6584363017.777778
401.3168726035.555556
601.9753098953.333333
802.63374511971.111111
1003.29218114988.888889

Computed with the same formulas as the calculator above — enter any values there for figures beyond this table.

Common questions

What size footing does my wall need?

Footing width and depth are set by the load, the soil bearing capacity and local code — this calculator only converts the dimensions you choose into a concrete volume. Get the dimensions from your plans or engineer.

How do I handle corners on a perimeter footing?

Measure the length along the centreline of the footing. Using the outside perimeter double-counts the corners; the centreline length keeps the volume right.

How does the Concrete Footing Calculator work?

The concrete volume for a continuous strip footing, in cubic yards and in 80 lb premix bags, from its length, width and depth. Length (ft) · Width (in) · Depth (in) → Concrete needed (yd³). The result updates as you type, and the formula and method on this page state every assumption used, so you can reproduce the calculation by hand.

What inputs does the Concrete Footing Calculator need?

Length (ft) · Width (in) · Depth (in) → Concrete needed (yd³). Densities, waste percentages and coverage rates are editable — adjust them to your supplier's figures. Invalid entries produce a plain-language message instead of a misleading number.