Home · Construction & Home DIY · Cement Calculator

Cement Calculator

The cement, sand and aggregate for a volume of concrete mixed to a chosen ratio: cement in 94 lb bags and the aggregates in cubic feet, using the dry-volume method.

Your figures

Example result — edit the figures to make it yours

7

Cement needed

Sand volume14 ft³
Aggregate volume21 ft³

What this calculator does

The cement, sand and aggregate for a volume of concrete mixed to a chosen ratio: cement in 94 lb bags and the aggregates in cubic feet, using the dry-volume method. Every figure is computed from the formula stated below. Densities, waste percentages and coverage rates appear as editable inputs with their planning defaults stated in the method notes — they are assumptions you can adjust to your supplier and your site, not industry standards.

The formula and method

Dry volume = wet volume × 1.54; Cement bags = ceil(dry ft³ × cement parts / total parts)

Dry loose materials occupy more volume than the finished wet concrete; the multiplier 1.54 is a commonly used planning value for that bulking, not a fixed constant — adjust your expectations if your mix design uses a different factor.

One 94 lb bag of cement is taken as about 1 ft³ (cement density ≈ 94 lb/ft³), so the cement volume in cubic feet reads directly as bags, rounded up.

Sand and aggregate volumes are reported in loose dry cubic feet from the same ratio split.

Worked example

With the example inputs this page opens with (wet concrete volume (yd³) 1, cement parts 1, sand parts 2, aggregate parts 3), the result is 7 — cement needed. Change any figure and the result updates with the same formula.

Quick reference

Quick reference — varying Wet concrete volume (yd³)
Wet concrete volume (yd³)Cement neededSand volumeAggregate volume
0.546.9310.395
1713.8620.79
21427.7241.58
32141.5862.37
53569.3103.95
1070138.6207.9

Computed with the same formulas as the calculator above — enter any values there for figures beyond this table.

Common questions

Why multiply by 1.54?

Dry cement, sand and aggregate contain voids and bulk up when loose; once mixed and compacted they yield less finished volume. The 1.54 factor is the standard planning allowance used to convert finished (wet) volume back to dry material volume.

What ratio should I use?

1:2:3 is a common general-purpose mix. Richer mixes (more cement) suit structural work and leaner mixes suit blinding and fill — the right ratio comes from your mix design or engineer, and the parts fields here accept any ratio.

How does the Cement Calculator work?

The cement, sand and aggregate for a volume of concrete mixed to a chosen ratio: cement in 94 lb bags and the aggregates in cubic feet, using the dry-volume method. Wet volume (yd³) · Cement parts · Sand parts · Aggregate parts → Cement (94 lb bags). The result updates as you type, and the formula and method on this page state every assumption used, so you can reproduce the calculation by hand.

What inputs does the Cement Calculator need?

Wet volume (yd³) · Cement parts · Sand parts · Aggregate parts → Cement (94 lb bags). Densities, waste percentages and coverage rates are editable — adjust them to your supplier's figures. Invalid entries produce a plain-language message instead of a misleading number.